Construction Update | 1st Floor Slab Casting – Pour 1

Construction at Zenith Residences continues to advance with the first slab casting pour for the 1st floor, marking another important milestone in the project’s structural development.

This phase involves the preparation and casting of the first section of the 1st floor slab. Reinforcement, formwork, technical inspections, and concrete placement are carried out in accordance with the project’s approved engineering specifications and structural requirements.

Following the progression of the podium structure and vertical elements, the commencement of the 1st floor slab represents another step in the building’s transition into its upper residential levels.

Zenith Residences continues to rise through each stage of construction with disciplined project management, technical precision, and a continued commitment to quality, reliability, and lasting value.